Form C Micro-Generation Connection Application
For Connection of Micro-Generation Facilities of ≤ 10 kW
This form is applicable to individual or multiple generating units at the Customer’s facility with total nameplate rating of 10 kW or less. Your generation facility must generate electricity from a renewable energy source that is wind, water, solar radiation, or agricultural biomass.
Inverter-based generating units must not inject DC greater than 0.5% of the full rated output current at the point of connection of the generating units. The generated harmonic levels must not exceed those given in the CAN/CSA-C61000-3-6 Standards.
For generation size up to 10 kW, a Connection Impact Assessment will not be required and Brant County Power will not perform such an assessment. There may be a limitation on the number of micro-generation facilities that can be connected to the same distribution feeder.
IMPORTANT: All fields below are mandatory, except where noted. Incomplete applications may be returned by Brant County Power Inc.
NOTE: Applicants are cautioned NOT to incur major expenses until Brant County Power approves to connect the proposed generation facility.
The following information is required for all generators with total generation of up to 10 kW.